YSYongnian Sourcing Desk Send RFQ
Guide · 7 minute read

What a 20ft container of solar mounting really costs

The unit price on the quote is roughly half the money. The rest is freight, charges, duty and the specification gaps that do not appear on the page.

Buyers who compare solar mounting quotes usually compare one number. The number that matters is the landed cost per installed unit — and it is built from eight or nine lines, several of which move independently of the factory's price.

The stack, in the order it accrues

LineWhat moves itWho invoices it
Goods, FOBAlloy, temper, coating thickness, wall tolerance, order quantityFactory
PackagingCarton grade, pieces per carton, pallet or looseFactory
Inland haulageDistance from factory to the loading port, and whether containers come from the port or the yardForwarder
Origin chargesTerminal handling, documentation, export clearanceForwarder
Ocean freightSeason, route, carrier; the single most volatile lineCarrier
InsuranceDeclared value; usually small, never optional on a first shipmentInsurer
Destination chargesTerminal handling, port fees, agent fees, delivery orderDestination agent
Duty and taxTariff code, origin, valuation basis, and any trade agreementCustoms
Inland deliveryPort to site or warehouse, plus unloading equipmentHauler

Two quotes that differ by 10% on goods can arrive 20% apart once freight and destination charges are real, not estimated.

Brackets are sold by volume, not by weight

Aluminium rails, clamps and fasteners are light relative to their bulk. A container of mounting hardware typically runs out of cubic metres long before it runs out of payload, which is why a per-kilogram comparison between suppliers is close to meaningless — you are not buying mass, you are buying the space the goods occupy.

The practical consequence: two suppliers quoting the same piece price can deliver very different freight costs, because one packs 12% more air into the carton. Ask for pieces per carton, carton dimensions and a stack plan before you accept a freight estimate. A loading plan with real CBM is worth more than a discount.

Where the money quietly hides

  • Alloy and temper. 6063-T5 in place of 6005-T5 changes the price without changing the drawing.
  • Coating thickness. A tolerance stated as 'minimum' rather than 'average' can halve the protection while keeping the certificate valid.
  • Wall thickness. A sub-millimetre reduction passes a casual check and shows up in a wind event.
  • Hardware grade. Stainless 304 and 410 look identical in a bag and behave differently in a coastal atmosphere.
  • Packing density. Air is not free once it is on a ship.

Comparing three offers without being fooled

Put every offer on the same basis before you read the number:

  • The same Incoterm — FOB and CIF quotes cannot be compared directly.
  • The same alloy, temper and coating thickness, written in µm.
  • The same packing specification, including pieces per carton.
  • The same hardware grade and the same bolt standard.
  • The same tolerance on wall thickness and hole position.
  • The same payment terms, and the same delivery window.

Once those six are aligned, the cheapest quote is genuinely the cheapest. Before they are aligned, the cheapest quote is usually the most expensive one in the file.

Send three quotes, get them re-based

I will put your existing offers on one basis and show you which line is actually different — before you place the order, not after the container lands.