YSYongnian Sourcing Desk Send RFQ
Method

What an inspection actually looks like

Two different jobs get called 'inspection'. One is finding out whether the factory is real. The other is finding out whether this batch is right. They use different checklists and different verdicts.

Dimensional check on extruded aluminium profiles at a factory bench
Wall thickness and coating thickness are measured on the bench, not read off a certificate.
01 — Factory audit

Ten checks, and what a fail looks like

#CheckA fail looks like this
01Legal entity and scopeThe business licence covers trading and sales only; nothing in it says manufacturing.
02Site typeAn office address. The video call reaches a sample room and stops there.
03Extrusion sourceNobody can name the extruder, or the answer changes between two calls.
04Dies and profilesNo die list for your section. Everything is 'the standard size'.
05Alloy and temperThe mill certificate says 6063-T5 while the quote says 6005-T5. Substitution is the most common quiet downgrade in this category.
06Coating lineAnodising or powder coating is fully outsourced, with no incoming inspection.
07Salt spray evidenceThe report belongs to another company, or shows a pass with no test hours stated.
08Gauge checkFive pieces measured on the floor; wall or coating thickness sits outside the agreed tolerance.
09PackingNo fixed packing station. Carton grade and stacking plan decided on the day the container arrives.
10Export recordThe name on the export declaration rarely matches the name on your invoice, and nobody will explain why.
02 — Pre-shipment

Sampling, grading, and what stops a container

A — Critical

Anything that can cause structural failure or a rejected installation: wall thickness below tolerance, wrong bolt grade, cracked weld, missing fastener sets in a sealed carton.

One finding holds the shipment.

B — Major

Coating thickness short of the agreed figure, hole position outside tolerance, length error that breaks assembly, wrong label or mark on the carton.

Above the agreed AQL, the shipment holds.

C — Minor

Cosmetic scratches, print quality, carton appearance, mixed labels that do not affect the goods.

Recorded, reported, does not hold.

Sampling follows an agreed AQL level, normally 2.5 for major defects and 4.0 for minor. The level is written into the order before production starts — an AQL agreed after the batch is finished is not an inspection rule, it is a negotiation.

03 — Report

Six blocks, one verdict

1 · Order and batch

PO number, factory, production dates, batch size, who attended.

2 · Quantity

Cartons and pieces counted against the PO. Short or over packing stated as a number.

3 · Measurements

Wall thickness, profile dimensions and hole positions on the sampled pieces, against your drawing.

4 · Coating and material

Coating thickness readings and the mill certificate, cross-checked against the quoted alloy and temper.

5 · Photographs

Carton marks, packing method, the measured pieces, and the defect itself — not a wide shot of the warehouse.

6 · Verdict

Release, release with concession, or hold. With the defect list and the remediation that would clear it.

04 — Escalation

Bad news travels fast, on purpose

Within 2 hours

Critical defect, wrong material, or a shipment about to be sealed with the wrong goods. You get a message before the report.

Within 24 hours

Full report, photographs, and a proposed remediation with the time it will cost.

Before release

Re-inspection of the corrected batch, or a concession letter that states exactly what you are accepting.

Ask for a redacted report

I can send a past inspection report with the client and factory details removed, so you can see the format before you commission one.