| Supplier shortlist | Three factories that can build your drawing, with capacity, MOQ and a like-for-like quote comparison. | 48 hours |
| Factory audit | A ten-point report: legal entity, extrusion source, coating line, certificates, packing, export records. Photographs for every claim. | 3–5 working days |
| Price benchmark | Your current quote re-based on the same alloy, temper, coating thickness and packing. The gap explained item by item. | 5 working days |
| Sample and spec check | Physical sample measured against your drawing: wall thickness, hole position, coating thickness (µm), hardware grade. | 2–3 weeks |
| Pre-shipment inspection | AQL sampling report with quantities, measurements, defect grades and a release-or-hold verdict. | 1 day on site |
| Consolidation and loading | Multi-supplier consolidation, a CBM loading plan, loading photographs, and one set of shipping documents. | Per shipment |
| Export documents | Commercial invoice, packing list, B/L draft check, certificates and test reports assembled into one pack for your broker. | Per shipment |